How to Link an RFI to a Change Event Using Origin Option (Procore Web)

Role

PCs or PMs

Objective

To link an RFI to a Change Event.

Steps

  1. Select Change events tool.

  1. Select Edit option beside a change event.

  1. Select the drop down menu under Origin then RFIs.

  1. select an RFI then Save.

Refer to the coordinating manual for further details regarding Changes, see link below.

Coordinating Manual Feb 2025.pdf